China Road Building Machine Steel Three Waves Guard Bar Plate Production Line Highway Guardrail Roll Forming Machine

China Road Building Machine Steel Three Waves Guard Bar Plate Production Line Highway Guardrail Roll Forming Machine

Highway Guardrail Roll Forming Machine
 

 

CZPT Requirements
1. Decoiler
With two tapered electric powered bulgy clamps, and its carrying potential is eight tons. The inner diameter of the roll substance is about 500 to 600mm, the maximum diameter of steel coil is 1800mm. Clamp motor electricity is two.2kw with 4-pole standard motor. Undertake ZQ250 velocity reducer, its velocity ratio is 31:5.

two.Leveling Machine
Wallboard seven-roller leveler with two-roll pinch and 5-roll leveling. Leveling roller diameter is 110mm. The leveling equipment just before and after has vertical manual roll. Feed inlet port equipped with nip rolls.
substance: 40Cr, quenched hardness: HRC48°~52°, motor energy:7.5kw, six-pole regular motor, ZQ350speed reducer, pace ratio: 20:49, φ200 arrester brake.

three.Punching Machine
Undertake YL32-315 four-column hydraulic punching equipment, and hydraulic station motor electrical power is 22kw. 1 established of two waves guardrail plates punching cutting die, layout and method primarily according to users’ design and style drawings. The substance of mould inserts and plunger chip is Cr12MoV alloy metal. The punching machine before and right after geared up with adjustable guide roll. (guidebook roll materials: Cr12MoV, hardness: HRC58º~60º) Aside from, it also outfitted with a established of spare blade and plunger chip.

four.fast feeding substance system
It has two pairs of feeders and needs two gets 1.
pinch automatically, motor electrical power:two.2 kw, ZQ250 pace reducer, hand-change compressing

five.Photoelectric Length-measuring Unit
quantity: two pairs, cut size: 4320mm, size accuracy < ±3.0mm

6. Major Forming Motor
This device contains eleven molding processes with impartial open arch construction.
The mechanical spreading width : 550mm.
Arch material : HT200 , tempered.
The column cross-segment size: eighty x 70, with ample toughness and trustworthy good quality assurance. Vertical guiding roller quantities: 3
Roller diameter of vertical guiding roller: 80 
Material: 40Cr steel, quenched and tempered.
CZPT sort: Mounted floor 7216, regulation 32216, every single has four.
Quantities of twin-axis equipment box: 1
Numbers of single-shaft transmission gear box: 9 
Bevel modulus: M=9
Gear box materials: HT200.
Host electrical power: 45KW r, electromagnetic pace regulating,
Pace reducer: ZQ650
Velocity ratio: forty eight.57
Use one inch double chain generate between the transmission equipment box common transmission shaft amongst the roller shafts, and the universal transmission shaft type is140-275. Use 1.5 inch dual chain generate amongst the velocity reducer.

7.Forming Mildew
A set of two wave guardrail plate roll forming die, created and processed in accordance to the countrywide standard. The materials is GCr15, and the general quenching hardness is HRC58°~ 62°.

eight.content Obtaining System
Roller kind materials obtaining station, 5m length, six# steel welded.

nine.Handle System
Common management program. Can manually and instantly control the harmony of different elements of of the entire production line.

ten.Other folks
The products complete power is seventy eight.9Kw, with 30000mm * 4000mm length * width. The highest rolling top is 85mm, the maximum rolling thickness is 4.0mm, and the highest rolling pace is three ~ 12m/min. Structural supplies of welding equipment seat have to fulfill the requirements, welding have to be up to the nationwide standard . Gear after rust cleaning must be to start with coated with steel specific anti-rust paint comprehensively masking, and then coated with substantial top quality topcoat. The rotating component must be divided by warning shade.

FAQ
one.Q: Are you company or investing business?
A: We are manufacture and trading business.
two.Q:What details you want before you make the proposal?
A:The pipe diameter and thickness variety which you need to have or the profile drawings, content data, your special demands.
three.Q: what is the MOQ?
A: One particular established
four.Q: Do you supply putting in and debugging abroad?
A: Overseas machine set up and employee coaching companies are optional.
five.Q: Can you make the equipment in accordance to my design or prototype?
A: Sure, we have an experienced staff for functioning out the most suitable design and generation plan for the machine that you are likely to book with us.
six.Q: How does your factory do concerning high quality management?
A :There is no tolerance relating to top quality handle. High quality manage complies with ISO 9001.each and every device has to earlier screening running prior to it’s packed for shipment.
seven.Q: How can I trust you that devices pasted screening working just before shipping and delivery?
A: one) We report the screening video for your reference
2) We welcome you check out us and examination device by yourself in our factory.
eight.Q: What about our after-sale service?
A: we offer specialized help on line as well as abroad services by skillful technicians.
9.Q: What need to I do if I just start a new company?
A:Contact us quickly ,we supply cost-free consultant pre-sales support.Also we can assist you to solve the material(steel coil)acquire,employee teach,worldwide market price.
10. Q:Can I visit you factory to check out equipment on-internet site ? What Need to I bring when I check out your manufacturing facility?
A: We are maker, and we welcome consumers to check out our factory. For unique item layout and develop, we request you deliver a piece of testing content, you can examination on our equipment on-internet site.

 

China Road Building Machine Steel Three Waves Guard Bar Plate Production Line Highway Guardrail Roll Forming Machine

Tags: