800m Crawler Mounted Water Well Drilling Rig

800m Crawler Mounted Water Well Drilling Rig

800A Top-driving total-hydraulic water nicely drill rig

Product Description

one-CZPT Parameter

Product:

800A  

700m

Drill diameter:

one hundred forty-500mm 

Air reverse double ply drill rod:

127mm(Optional)

Operating air pressure:

one.05-6.45Mpa

Air usage:

sixteen-ninety six.four m³/min

Drill rod size:

four.5m 

Drill rod diameter:

89mm108mm 127mm

Axial strain:

6t 

Lifting pressure:

32t

Sluggish lifting velocity:

four.4m/min 

Quick lifting speed:

25m/min

Gradual feed speed:

.five-seven.2m/min 

Quick feed pace:

36m/min

Rotation torque:

13000Nm6500Nm

Rotation pace:

-80r/min0-160r/min
Lifting capacity of big winch: 4t Duration of steel rope: 60m
Lifting capability of little winch: 1.5t Mud pump movement charge: 600L/min(Optional)
Centrifugal pump circulation fee: 1300L/min(Optional) Dynamo: 24Kw/380v(Optional)

Quality capability:

21° 

Penetration fee: 10-25m/h

Drilling Strategy:

Downhole hammer or Mud Drilling

Total dimension:

eight.7×2.3×3.3 m

Weight:

15.five t

Hammer:

Intermediate or large air force sequence

Application development:

Unconsolidated layer or bedding rock

 

two- Composition Features:

one. Diesel motor-driving hydraulic technique. Vacation, rotate, feed, hoist, land, lift, unload and so on are all operate by hydraulic parts.
two. Throughout rock drilling procedure, you can use down the hole hammer or reverse hammer(optional) that air compressor will supply wind to travel and slag. In operation, you      can use hammer and widespread drill rod to make constructive circulation operation or use reverse hammer and double ply drill rod(consumption air by way of the hole of the double ply,  and slag by way of the inner tube) to make reverse circulation operation.
three. If use reducing or tri-cone bit to drill the gap, you can pick mud pump and slag with mud.
4. Doing work device consists of feed program, slide guide(mast), top-driving rotary head, slide plate, centering apparatus, unloading technique and hoisting system, etc.
5. CZPT stress integrates the leading-driving rotary device into block to comprehend the electrical power output of the torque and speed of the two finishes in continual power, low speed          high torque and higher velocity lower torque. In buy to adapt to distinct site circumstances and drilling diameters.
6. Rotary device is capable of turning absent from the drilling axis, and make it practical for the winch to fall the pipe and run.
7. Cylinder plate chain propulsion manner, dependable and resilient
eight. Roller slide is wearable.
nine. Axial stress, feed velocity and rotation pace are adjustable.
10. The lifting potential of large winch is 4 tons. The steel rope is 60 meters prolonged, and it can support with lifting, dropping the pipe. The lifting capability of tiny winch is 1.five tons, and      can carry drill bits, tools, and many others. Or aid with discharging drill rod.
eleven. Crawler self-driven structure travel method, simple to go. Use crawler chassis. Steel monitor hyperlink(Inlaying rubber block is in option which is easy to vacation on town streets).With 4 large landing legs as normal configuration. In the course of long-distance transportation loaded with car, it can be moved onto the vehicle right and effortless for transportation, no need to have to carry.
12.Individual hydraulic oil cooler makes it possible for the drill rig to perform constantly and the temperature of hydraulic oil will not get higher.
thirteen. For the duration of operation, 4 hydraulic landing legs will change the rig physique level and steadiness
14. For the duration of procedure, the mast can be set with the rig body, and a back knighthead will enhance the procedure steadiness of the mast.
15. Stage instrument and focused centering apparatus make certain the perpendicularity and precision of the drilling hole.
16. Compressed-air technique gives special oil mist lubricator to lubricate the hammer and longer the serving lifestyle of it

Connected Goods

We can also source other drilling rig, drilling gear and drilling equipment, such as Trailer Mounted Drilling Rig, Truck H2o Effectively Drill Rig, Main Drill Rig, Mud Pump, Air Compressor, DTH Hammer, Tricone Bit, Drag Little bit, DTH Little bit, and so on.

 

Packing and Transportation

Packing: Seaworthy Packing
Shipping: about 30 days soon after your down payment.

Organization Profile

CZPTtek Sector (ZheJiang )Co.,Ltd., located in ZheJiang , China, is an built-in corporation specialised in production and exporting top quality drilling products and drilling areas for decades. We are supported and assisted by a highly skilled crew of designers and engineers that permit us to comprehensive all the assigned initiatives successfully as for every the specified requirement from our clients.

Our merchandise are extensively utilized in the scope of mining, water effectively drilling and exploration, anchor grouting undertaking, side slope protection engineering, oil and gasoline engineering,underwater rock drilling & blasting functions of seaport channel, hydropower venture, nationwide protection projects ect.
 

Exhibition

Certifications

CZPTer Images

After-sale Warranty

(1) Within the period of the first year right after delivery, the major elements of Drilling Rig are guaranteed to be provided cost-free of cost once the issue induced by the high quality situation. 

(2) Services at doing work internet site: If need, our specialized engineer can be dispatched to the working website for complex support, but the price of ticket, lodging, diet, support demand shall be on buyer’s account. 

(three)Well timed soon after-sale help shall be offered all the time.

FAQ

Q: Are you unique company or trading business?
A: We are an integrated company specialised in producing and exporting.

Q: Can you provide connected drilling equipment?
A: Yes, we can offer entire established of drilling instruments, this kind of as drill pipe, tricone little bit, PDC little bit, drag bit, DTH hammer and little bit. In addition, we have drilling equipments like mud pump, air compressor, and so forth. as well.

Q: Which payment phrases can you accept?
A: Typically we favor thirty% advance payment after purchase get by T/T, 70% remaining payment ahead of delivery by T/T.

Q: How is your shipping and delivery time?
A: This will rely on your purchasing amount. Typically we can deliver inside of 30days.

Q: How can you ensure the top quality?
A: We have our specialist QC and all the goods will be stringent inspection and tests for each buy before transport out.

Speak to Us

Jane Cheng
Sales Representative 

CZPTtek Industry ( ZheJiang ) Co., Ltd. 
Address:No.B-2507, Xihu (West Lake) Dis.WeiCheng, GuanZhuang,Chao Yang District, ZheJiang , China. 
Tel: -10-52864265/52864786 
Fax: -ten-5257170 
Cellular:-13426425710 
Internet site:  
 

800m Crawler Mounted Water Well Drilling Rig

Tags: