1020 Honed Tubing

1020 Honed Tubing

Component I&colon Solution INTRODUCTION
one&period Description&colon 
Honed tube is a kind of easy bore metal tube utilised to manufacture hydraulic cylinder barrels that is the main part of a piece of hydraulic cylinder&period 

2&period of time Commodity&colon 1571 Honed tubing

three&period Dimensions range&colon 40mm&ast30mm-580mm&ast500mm

four&period Offered metal quality&colon 

SAE&solAISI&colon  SAE1571&comma SAE1026&comma SAE1045&comma SAE4130&comma SAE4140
DIN&colon  ST52&comma ST52&period3&comma ST52&period4
EN&colon  E355&comma C45E&comma 25CrMo4&comma 42CrMo4&comma CK45&comma S45C&comma E410&comma E470
GB&colon  20&num&comma 45&num&comma 16Mn&comma Q345B&comma Q345C&comma Q345D&comma Q345E&comma 25Mn&comma 27SiMn&comma 

five&period of time Manufacture approach&colon Chilly rolled&comma hydraulic cold drawn&comma sizzling rolled&plusdeep hole uninteresting

6&period Shipping problem&colon 

BK BKW BKS GBK NBK Q&plusT
&plusC &plusLC &plusSR &plusA &plusN
Chilly rolled Chilly drawn Pressure relieved Annealed Normalized Quenched&plusTempered

7&interval Bore treatment method&colon Honing&comma skiving&roller burnishing

8&period of time Bore roughness handle&colon Ra0&period25um max or Ra0&comma 35um max for honed tubes&comma Ra0&period25um max for skived&roller burnished tubes&period 

nine&period Stop end&colon Basic ends with sq. cuts&comma cost-free of burrs for honed tubes&period of time Little bevelled ends for skived&roller burnished tubes&period 

ten&period CZPT export packing&colon In bundles tied with steel strips&period Int&ext oil coating&interval Stop plastic caps&time period External packing by PVC bags and knit bags&period 

eleven&period CZPTized packing and marking can be supplied upon ask for&period 

twelve&period of time H8 tolerance&colon 

ID selection Tolerance ID selection Tolerance
18< d ≤30 &plus0&sol&plus0&period033 180< d ≤250 &plus0&sol&plus0&period072
30< d ≤50 &plus0&sol&plus0&period039 250< d ≤300 &plus0&sol&plus0&period081
50< d ≤80 &plus0&sol&plus0&period046 300< d ≤315 &plus0&sol&plus0&period081
eighty< d ≤120 &plus0&sol&plus0&period054 315< d ≤400 &plus0&sol&plus0&period089
120< d ≤180 &plus0&sol&plus0&period063 400< d ≤500 &plus0&sol&plus0&period097

13&period Distinction between honed tube and skived&roller burnished tube&colon In hydraulic cylinder market&comma there are 2 solutions for bore remedy&colon Honing&comma and skiving&roller burnishing&interval Honing or skiving&roller burnishing qualified prospects to distinct inner surface graphic&comma but both make sure good roughness&period 

Interior Floor Condition OF HONED TUBES&colon

Inside Floor Situation OF SKIVED&ROLLER BURNISHED TUBES&colon

Element II&colon Often Requested Concerns
1&period of time MOQ&colon 
CZPTly Min Order Quantity can be two-3 tons&solsize for tubes with OD underneath 250mm&comma and ten tons&solsize for tubes with OD previously mentioned 250mm&interval Often&comma it is dependent on steel grade you need to have&period of time If you need specific quality like E410&comma E470 or alloy steel tube&comma MOQ should be ten tons&solsize at least&period 
2&period Shipping and delivery Time&colon CZPTly&comma our supply time for honed tubes is close to forty-60 days dependent on the sizes and portions&interval It will get us fifteen-thirty times to get uncooked materials&period For example&comma if you need 3 tons of small dimension honed tubes 50mm&ast40mm with roughness of Ra0&period25um max&comma it will get us at minimum 30 days to hone this dimensions&period 
3&period Warranty&Guarantee&colon Warranty&ensure period is 6 months considering that we produce the tubes&comma and we are not accountable for good quality problem triggered by improper unloading or storage following shipment&time period We welcome customer’s inspection prior to cargo&period 
four&period of time Payment Approach&colon We take payment strategy like T&solT&comma L&solC&comma or D&solP&comma but it relies upon on our investigation about clients&period We have a solution to appraise the credit score of clients from all over the world&comma and time and sum of D&solP we can release is determined by the evaluation&period 
five&time period Good quality Management&colon 90&percnt of the tubes are made from sizzling rolled seamless pipes&period So&comma top quality of uncooked materials identified top quality of finished tubes&time period We purchase raw content from secure suppliers who are foremost metal mills&comma and we examine the raw substance as for each the specifications&time period For the duration of our production method&comma there is inspection and top quality management in each phase&period 

Portion III&colon Organization INTRODUCTION
We are a manufacturer of cold drawn&comma chilly rolled&comma and hydraulic chilly drawn steel tubes with OD upto 356mm since 2002&time period Covering an area of about 32000M2&comma we have twelve regular workshops with 2 hydraulic cold drawing benches&comma 4 chain cold drawing benches&comma and 2 ERW mills&interval Our facilities covers all the manufacturing processes from pickling&comma chilly drawing&comma heat dealing with&comma observed cutting&comma straightening&comma inspection&comma packing to further machining &turning&comma cold drawing die fabrication&comma and gear repairation&servicing&period 

Factory Visual appeal&colon

Uncooked Content Stock&colon

HYDRAULIC Chilly DRAWING&colon

MULTI-ROLLER STRAIGHTENING&colon

STRAIGHTENING BY Press&colon

Noticed Chopping&colon

LATHES&colon

HONING&colon

DEEP Gap Boring&solDRILLING&colon

SKIVING&ROLLER BURNISHING&colon

 

1020 Honed Tubing

Tags: